A clear scope, then the install.

  1. 01

    Scope is written

    The owner and the GC know what is included and what is not.

  2. 02

    Quantities come from the drawings

    Takeoff follows the plans. The price matches the install.

  3. 03

    Work is coordinated

    Access, sequencing, and shutdowns are planned before the crew is on site.

  4. 04

    Installed to the documents

    Work goes in to the plans, specs, and applicable code.